Projects

Our Projects

Empowering through Every Project

For years, Lucsam has been at the forefront of numerous industries, providing reliable power

solutions both nationally and internationally.

  • MasterMind Tobacco Co Nairobi.
  • Ketraco Isinya 400kv substation (Eastern Electricity Highway) 500kva
  • Manipal Printing Press Athi River 500kva 2 units Synchronized
  • Kenya Civil Aviation Authority
  • Kisumu Water Project (Ndano Falls) China Jiangxi International : 320kva Silent
  • SGS Kenya 25kva several weighbridges.
  • Defence Forces Memorial Hospital (DFMH) : 750KVA Silent Mbagathi Road
  • Jumbo Steel Mills Limited 750kva Perkins Kisumu
  • Department of Defence (DOD) Moi Air Base Isleah : 200KVA Silent
  • KPLC Standard Telecom Collocation Facilities : 50kva 12units.
  • Core Construction 300 and 600kva synchronized Nairobi. ( THE ADDRESS ) Wayki Way
  • The GALLANT (Shalimar) 365 and 500kva Synchronized Parklands Road
  • Serengeti Safari Lodge Kisumu 160kva
  • INDIAN HIGH COMMISSION OF KENYA 62.5KVA GIGIRI
  • EMBASSY OF PORTUGAL - 30KVA
  • HOMABE COUNTY GOVT INSTALLATION 125KVA
  • KRA Building Nakuru 160kva
  • Bomet county referal hospital 320kva
  • CRT CAMP RECCE COMMANDO TRAINING ENTRE RUIRU INSTALLATION 125KVA
  • CO-OPERATIVE, NCBA BANK - 40KVA, 30KVA, 20KVA ABOUT 35-40 BRANCHES
  • Central Electricals Nairobi.
  • Mediheal Group of Hospitals UpperHill, EastLeigh, Eldoret, Nakuru, Kigali
  • Bliss GVS LIFECARE Bungoma Hospital Kenya : 600kva and 200kva
  • Hill View Hospital Westland Nairobi
  • Medifort Hospital Kissi 320kva (Meditest)
  • Smile Africa Spring Valley 160kva
  • Fortis Hospital Meru 200kva
  • Almont Company Ltd Brookside Nairobi 380kva (Westside Towers Lower Kabete Road)
  • Lymack Holdings Ltd : 125kva Kiambu
  • The Allure 250kva Gen Mathenge Nairobi
  • Rottecher Estate Nairobi. 200kva Karen
  • Platinum Square Nairobi Industrial Area
  • Southwell Kapsabeth 125kva
  • Qairesalam 125kva 4 units Eastleigh.
  • Kiambu 160kva Feruzzi Towers
  • Unifilters (K) ltd 200kva 2nd parklands.
  • 160kva installed in Town CBD
  • RESIDENZ - 250KVA LOWER KABETE DMI GROUP
  • MILIKI DEVELOPMENTS 125KVA LAVINGTON TOWN HOUSES
  • SUNTEX DEVELOPERS - 125KVA BROOKSIDE DRIVE
  • Njoro Canning 500kva Nakuru
  • Compact Poles Nairobi : 400kva
  • Earthoil Africa EPZ Aithi River Nairobi. 320kva
  • Nairobi University Project 250kva
  • Suguna Feeds Kenya 180kva 2 units dual backup for Hatchery Kajiado & Thika
  • Kipepeo Rongai 320kva Paint Factory.
  • Fujita Corporation Japan – 500kva Mombasa
  • KENTEGRA 500KVA EPZ INSTALLATION PYRETHREUM MANUFACTURER
  • Arauphar Production, Limete Kinshasa R. D. Congo 1010kva
  • Modern Construction Kinshasa R. D. Congo 750kva x 2 units
  • Aura Pharmaceuticals Congo : 1010kva
  • Promed Lab RDC Congo 250kva
  • SKA 400kva 2 units Synchronized Congo
  • Kotecha Group 320kva Bukavu Congo.
  • Mediheal Kigali : 320kva
  • Newaco Group Angola : 4.7MVA
  • Alchem Industries Bujumbura Burundi.
  • Quality Extended Enterprise limited Tanzania
  • Bab El Khair Co Manhal Health Care Hargesia, Berbera – Somalia
  • Aven Premier 320kva x 2 units (captive units) Mogdishu Somalia
  • Mato Plastic Ethopia : 125kva @ 380v Ethiopia
  • Tsehay Farmers Union Gondar Ethopia : 500kva @ 380v Ethiopia
  • VitaFoam Tanzania Syncronize 250kva and 160kva
  • Kiboko - Uganda 400kva and 125kva with Changeover Powerfactor and Stabiliser bypass panel
  • 1.5mva Cameroon with 5000A sync, PCC panel with 900kvar Powerfactor panel.
  • 250kva Ku Burundi Oil Mill Project
  • 320KVA ETHIOPIA RESIDENTIAL INSTALLATION WITH C/O METER BOARD
  • US EMBASSY ETHIOPIA - 30KVA
  • 250kva BURUNDI FOR OIL MILL PROJECT
  • 250KVA SUPPLIED IN BENIN AFRICA
  • 380 X 2 UNITS RAWANDA BANK OF KIGALI
  • 1250KVA WITH 1500KVA ALTERNATOR FOR ALTITUDE AND 380V DEGRADATION
  • ETHIOPIA OIL MILL PROJECT